Factories Act, 1934
Factories Act, 1934 — section 40
40. Copy of Notice of Periods for Work to be sent to Inspector..—_(1) A copy of the Notice referred to in sub-section (1) of section 39 shall be sent in duplicate to the Inspector within fourteen days after the commencement of this Act, or, if the factory begins work after the commencement of this Act, before the day on which it begins work.
(2)Any proposed change in the system of work in a factory which will necessitate a change in the Notice shall be notified to the Inspector in duplicate before the change is made, and, except with the previous sanction of the Inspector, no such change shall be made until one week has elapsed since the last change.
This is the text of the provision as enacted. It is legal information, not legal advice, and it cannot account for the facts of your own matter. For advice on your situation, consult a verified advocate.
